91久久久久-日日摸日日添日日碰9学生露脸-操极品美女-久久久久久久亚洲-伊人影音-男人天堂电影-成人毛片在线播放-中文字幕一区2区3区-国产一区亚洲-夜夜夜夜爽-一区二区三区视频免费-aaa级黄色片-午夜精品一区二区三区在线观看-欧美亚洲国产一区二区三区-一区二区视频在线免费观看-天天看天天做-免费日韩一区二区-毛片久久久久久久-99re6这里有精品热视频-久久这里只有精品23

News

Welding Story | K Series Rail Welding Machine & "strong rail"

Release time: 2018-12-22

Behind the endless rail, there are a group of unknown professional welders, who devote their enthusiasm and responsibility to the welding career. 


Baocheng Railway is the first electrified railway in China. In 2010, on the Baocheng Railway Passenger Dedicated Line, when a K165 passenger train passed through the Shitingjiang Bridge in Guanghan, Sichuan Province, the bridge collapsed due to heavy rainstorms in summer, and two passenger carriages were suspended in V shape on the turbulent river surface, teetering.

微信圖片_20190708094407.jpg

Fortunately, two tracks firmly hold the carriage, giving passengers sufficient time to escape. Then these two carriages fell into the river after ten minutes. The rails welded by the K190 rail welding machine have not been disconnected from beginning to end!


微信圖片_20190708094412.jpg 

In this accident, the welding position of the two rails was marked, and the information of the welding head was recorded. Tracing back to its source, we know that "strong rail" came from Chengdu Shibantan Welding Rail Factory, and was welded by a welding superman named Du Dinglin, who was led by K190 welding rail machine.

微信圖片_20190708094421.jpg

Since the introduction of the first Ukrainian Barton K190 rail welding machine by Chengdu Rail Welding Plant in 1989, Du Dinglin has operated various types of K series Barton rail welding machines, such as K900, K1000 and K1100, to stably and efficiently output long rail for the construction of the railway network in the whole southwest.


微信圖片_20190708094426.jpg